Is a 22 foot railroad underpass the right way in for 538 heavy vehicles a day? The Kondelin Road truck questions
Every heavy truck would leave the industrial park by one road, through a narrow S-curve underpass and past school bus stops. What the record says about traffic, safety, road wear and diesel exhaust, and what it leaves open.

Trust Check: Checked against public records
Is a 22 foot wide railroad underpass in an S-curve, with school bus stops nearby, the right and only way in for up to 538 heavy vehicles a day? That is the traffic question behind the proposed construction waste station at 24 Kondelin Road in West Gloucester. Every heavy truck would leave the industrial park by one road, Kondelin Road, then turn onto Magnolia Avenue and pass under the railroad.
This is the third piece in a daily series ahead of the Conservation Commission hearing on Wednesday, Nov. 18. The full record ran Friday.
The route
Truck route and bridges
The only way in or out for heavy trucks, from Kondelin Road to Route 128. Tap a pin for details.
- Station site, 24 Kondelin Road. Trucks leave the site and travel Kondelin Road to Magnolia Avenue.
- Kondelin Road and Magnolia Avenue. Turn north. Heavier vehicles cannot use Magnolia Avenue south of Kondelin Road (2.5 ton limit).
- Railroad underpass on Magnolia Avenue. 22 feet wide, in an S-curve. The decision found the company's study did not model two heavy trucks meeting here. OpenStreetMap lists a 13 foot 6 inch height limit for this segment (not confirmed in the hearing record).
- Magnolia Avenue meets Essex Avenue (Route 133); rail bridge over Essex Avenue. A second railroad bridge is mapped over Essex Avenue here (OpenStreetMap). It was not discussed in the hearing record we read. Bus stops and the West Gloucester commuter rail station are nearby.
- Essex Avenue and Concord Street. One of the eight intersections in the company's traffic study.
- West Parish School, Concord Street. The decision says the company's study did not look at school bus stops on Magnolia and Essex avenues or school bus traffic to this school.
- Route 128 ramps. Outbound transfer trailers were assumed to head to disposal sites south and west through this interchange.
Route and bridges: OpenStreetMap contributors (road lines and railroad bridge positions are approximate). Route description: Board of Health decision, June 18, 2025, and the company's traffic impact and access study (Exhibit 1C). Aerial: MassGIS 2025.
The numbers in the record
| Measure | Figure | Source |
|---|---|---|
| Heavy vehicles on the route now | 389 a day | City's traffic reviewer, Weston and Sampson |
| Heavy vehicles with the station | 538 a day | City's traffic reviewer |
| Cap on added diesel truck trips | 149 a day, measured over a year | Board of Health decision |
| Truck entries estimated by the EDIC | 130 to 140 a day, about one every four to five minutes at peak | EDIC minutes, June 2025 |
| Increase in traffic estimated by an abutter's expert | 98 percent | Hearing testimony, as described in the decision |
| Operating hours | Mon. to Fri., 6 a.m. to 6 p.m.; Sat., 7 a.m. to noon; closed Sundays | Condition 6 |
| Waste receiving hours | 7 a.m. to 4:30 p.m. weekdays; to 11:30 a.m. Saturdays | Condition 6 |
| Truck count reporting | Quarterly self reports to the Board of Health | Conditions |
The city's reviewer wrote in January 2025 that the 2023 estimate was 70 vehicles in and 70 out, so trips appear to be counted one way. Whether the cap means 149 one way trips or round trips is a question for the Board of Health.
The truck counts depend partly on where the loads come from, and the record does not say. The approval does not limit it.
The company's witness testified that the station would handle about 180 tons a day normally and up to 270 at the maximum, and said the greater Cape area could sustain that. We compared that with the state average. In 2024, Massachusetts disposed of 1,710,000 tons of non-municipal solid waste, a category MassDEP says grew primarily because of construction and demolition debris. Divided by the state's 2024 population of 7,138,560, that is about 0.24 tons per resident. At that rate the four Cape Ann towns, with 46,886 residents in 2024 estimates (Gloucester 30,544, Rockport 7,099, Essex 3,771, Manchester-by-the-Sea 5,472), would dispose of about 11,200 tons a year, or about 43 tons on each weekday. The company's 180 to 270 tons a day, on a five day week of 260 days, is about 46,800 to 70,200 tons a year, roughly 4 to 6 times that.
This is our arithmetic, not a finding in the record. It uses a statewide average of all non-municipal solid waste, which includes more than construction debris, so it likely overstates what Cape Ann disposes of, and it counts disposal only, not debris that is recycled. Cape Ann may differ from the state average, and the company has not said what share would come from each town or from outside. The company's witness also said at the June 4, 2025 hearing that it would not check where customers live or limit use to Gloucester or Cape Ann. Added Nov. 15, 2026. Updated Nov. 17, 2026 to use 2024 state data in place of 2018 data.
The underpass
The underpass is 22 feet wide, in an S-curve. The decision found the company's traffic study did not model two heavy trucks meeting there. The company's expert called two heavy trucks passing a "tight fit." The city's reviewer wrote in a February 2026 draft that trailers fill the lane even at 10 miles an hour. The city's Director of Public Works testified that the road under the bridge was lowered in 1971 so trucks could fit, which left a dip that floods.
Heavier vehicles cannot use Magnolia Avenue south of Kondelin Road, which has a 2.5 ton limit. The route runs north. Fixes accepted so far are speed advisories and signs.
Sources: Board of Health decision; Weston and Sampson peer reviews, Jan. 7, 2025 and Feb. 5, 2026 (draft); hearing testimony as cited in the decision. Road lines and bridge positions on the map come from OpenStreetMap and are approximate.
An advisory speed asks drivers to slow down. It is not a posted limit. Source: Weston and Sampson peer review of the supplemental traffic study, draft, Feb. 5, 2026.
Children, walkers and cyclists
The decision says the traffic study did not consider school bus stops on Magnolia Avenue and Essex Avenue, or bus traffic serving West Parish School on Concord Street, and did not analyze people on foot or on bikes. On Oct. 8, 2026 the Board of Health ordered the unanswered part of condition 18, on walkers and cyclists, answered.
Pollution from more trucks
The decision's air finding addresses dust and exhaust at the site: all tipping and loading would be inside an enclosed building with four exhaust fans and misting for dust. Along the route, the conditions cap added diesel trips, require trucks queuing on site to follow state and local anti-idling rules, and require quarterly truck counts. EPA's ECHO profile lists the area around 24 Kondelin Road as within an ozone nonattainment area under the 1979 one hour and 1997 eight hour standards, and counts about 1,161 residents within a mile, 19 percent of them under 18 and 26 percent 65 or older. The conditions do not set a measurement for diesel exhaust or particles along Kondelin Road, Magnolia Avenue or the underpass.
The questions residents are asking
These questions come from gaps in the public record. Each stays open until the office that holds the answer responds.
Is the underpass ready for 538 heavy vehicles?
Who can answerPublic Works, Police, the railroad owner and the company
Questions- Transfer trailers fully cross the lane even at 10 miles an hour, so how would two trucks meeting under the bridge work, and who would give way?
- What warning signs, height signs and lane markings are at the underpass today, and are the lines faded? Who repaints them?
- Will Magnolia Avenue's markings and signs be upgraded before the first loaded truck, and who pays?
- Sight distance is not enough for trucks heading north. What stops a driver meeting oncoming traffic on the corner?
- The accepted fixes are an advisory speed and signs. What happens if drivers ignore them?
- If the company's study comes back saying Gloucester needs to improve the road, who pays: the company, taxpayers or the state?
- What would heavier traffic on the route do to home values along it, and has anyone asked?
Is the route safe?
Who can answerBoard of Health, Public Works, Police, Fire and the railroad owner
Questions- What happens when two loaded trucks meet in the underpass, and who has modeled it?
- Why was the study not required to model two heavy trucks meeting before the site was assigned?
- Will fire engines and ambulances still reach homes and the industrial park when a truck blocks the lane?
- Who owns and inspects the underpass and the Essex Avenue rail bridge, and have clearance and bridge strike records been checked?
Is there another way in?
Who can answerBoard of Health, EDIC and the company
Questions- Why is there only one route for heavy trucks?
- At the EDIC's Nov. 10 meeting an attendee asked whether the company looked at moving material by rail. The chair said the line beside Kondelin Road is commuter rail only. Was any other way in or out considered?
- Could the company be limited to fewer trips or certain hours, or barred from peak school bus times?
- Would the city have accepted this traffic pattern for a site in a neighborhood with more homes?
What about the people who live along it?
Who can answerBoard of Health, Public Works and the school department
Questions- Who is protecting children at bus stops on Magnolia Avenue and Essex Avenue?
- Is there a plan for sidewalks, crosswalks or signs on the route?
- What is the noise and air burden on homes near the route, and who measures it?
What about pollution from the trucks?
Who can answerBoard of Health, MassDEP and the company
Questions- Is the 149 trip cap enforced by anything other than the company's own count?
- Will anyone measure diesel exhaust or particles along the route before and after the station opens?
- What does the cap mean in practice: 149 one way trips or round trips?
Who pays for the road?
Who can answerPublic Works and the City Council
Questions- What does heavy truck traffic do to the life of Magnolia Avenue and Essex Avenue?
- The $10,000 bond covers debris cleanup. What covers pavement wear, drainage in the 1971 dip and repairs after a bridge strike?
Where this stands
The truck conditions are part of the Board of Health decision. The wetlands filing is before the Conservation Commission on Nov. 18, and the state construction permit, zoning approval and site plan review are still ahead. The route and the underpass can be raised at any of those hearings. See how to take part.
The Kondelin Road series
One piece a day through the Nov. 18 hearing.
- Fri. Nov. 13The full record
- Sat. Nov. 14Who pays: cost to the city
- Sun. Nov. 15You are hereTrucks, roads and safety
- Mon. Nov. 16Water, health and the company record
- Tue. Nov. 17Why here? Fairness and the EDIC reversal
- Wed. Nov. 18Hearing day: what can be decided
Sources
- RecordMassDEP: 2025 Solid Waste Master Plan program and policy assessment (Table 1: non-municipal solid waste disposal, 1,710,000 tons in 2024)
- RecordUMass Donahue Institute: Annual resident population estimates for Massachusetts municipalities, July 1, 2024 (state total is the sum of the 351 municipalities, 7,138,560)
- RecordMassachusetts Secretary of the Commonwealth: Essex County population, 2019 estimates (Gloucester, Rockport, Essex, Manchester-by-the-Sea)
- RecordGloucester Board of Health hearing, June 4, 2025, city recording and automatic transcript (witness on 180 and 270 tons a day and on not restricting customers)
- RecordCity of Gloucester: Eastern Waste Services (EWS) Site Suitability Application for C&D Transfer Station (project page and timeline)
- RecordGloucester Board of Health: Site Assignment Decision, Eastern Waste Services LLC, 24 Kondelin Road, June 18, 2025
- RecordEastern Waste Services: Second Update on Permit Compliance, presentation to the Board of Health, May 7, 2026
- RecordWeston and Sampson: peer review update of the Eastern Waste Services traffic study, Jan. 7, 2025
- RecordWeston and Sampson: peer review of the supplemental traffic study, draft, Feb. 5, 2026
- RecordMassachusetts Department of Public Health: comment letter on the site suitability application, Nov. 21, 2023
- RecordMassDEP: Administrative Consent Order with Penalty and Notice of Noncompliance No. 00012892, Eastern Waste Services LLC, effective March 10, 2022
- RecordMassDEP, Energy and Environmental Affairs Data Portal: Essex County Recycling Center, facility 368513 (permits, inspections, enforcements), checked Nov. 11, 2026
- RecordU.S. EPA Envirofacts: RCRAInfo facility detail, handler ID MAR000625293 (hazardous waste codes, handler types), checked Nov. 11, 2026
- RecordU.S. EPA ECHO: Detailed Facility Report, Eastern Waste Services LLC, 24 Kondelin Rd (FRS 110071467359; RCRA ID MAR000625293), checked Nov. 11, 2026
- RecordFederal Motor Carrier Safety Administration: SAFER company snapshot, Eastern Waste Services LLC (USDOT 3063127)
- RecordGloucester Board of Health, Eastern Waste Service Subcommittee agenda, Oct. 6, 2026
- RecordGloucester Conservation Commission agenda, Oct. 7, 2026
- RecordGloucester Conservation Commission agenda, Oct. 21, 2026 (revised)
- RecordCity of Gloucester Solicitor's Office: Eastern Waste Services Approval Process and Permit Tracker, released by the Board of Health March 3, 2026
- RecordHiltz Waste Disposal: Essex County Recycling Center page (24 Kondelin Road)
- SourceWaste Today: MassDEP penalizes Eastern Waste Services for solid waste violations (2022)
- RecordGloucester Board of Health hearing exhibits (city Drive folder): Exhibits 1 to 36, including the Aug. 11, 2023 application, the traffic study and the Oct. 17, 2023 EDIC letter
- RecordGloucester Conservation Commission case folder for the Eastern Waste Services notice of intent, plans and public comments
- RecordGloucester Board of Health memo to the Conservation Commission on gaps in the third party review, Oct. 8, 2026
- RecordGloucester EDIC minutes, June 2, 2025 (vote to support the site)
- SourceMap data: OpenStreetMap contributors; aerial imagery MassGIS 2025
- RecordMassDEP: 310 CMR 19.000 solid waste regulations, definitions (19.006) and waste bans (19.017), as published by Cornell LII
- RecordMassDEP: Minimum Performance Standard for Construction and Demolition Handling Facilities (updated July 2024)
- RecordMassDEP: Waste Ban Guidance for Operators of Solid Waste Facilities (Oct. 2021)
- RecordMassDEP: Asbestos Information Resource Guide (June 2023)
- RecordMassDEP: Asbestos Containing Waste Material temporary storage policy (amended Dec. 2025)
- RecordU.S. EPA: Industrial and construction and demolition landfills
- RecordU.S. EPA: How should lead containing wastes from renovations be handled and disposed
- RecordU.S. EPA: Asbestos NESHAP, demolition and renovation requirements
Do you trust this story?
See something wrong? Email [email protected]. Read our standards and corrections policy.